Permits and process

A clear process from assessment to handover.

Who does what, in what order, and what can change the timeline, from the first call to the secondary suite permit and final inspection. No 400-page code manual, just what you need to make good decisions.

Basement suite job site in Calgary with framing, drywall and tools
A suite build in progress, with the inspection stages visible in the work.

Who is responsible for what

TaskYouThe Suite DepartmentDesign partnerTradesCity
Share goals, budget, access●
Assessment and scope●○
Permit drawings○●
Permit application○●○
Regulated trade work○●
Inspections○○●
Approve changes●○

● leads · ○ supports

Framed basement suite walls with window openings ready for rough-ins

Every gate in the list below leaves a document behind: drawings, permits, inspection results.

Permit and inspection stages

  1. Fit call

    Free. We find out if it's worth a visit.

  2. Assessment

    Paid, defined visit. Written report and next step.

  3. Design and scope

    Drawings and a written scope with exclusions. Design and quote are separate steps.

  4. Quote and agreement

    Signed contract, payment schedule, start conditions.

  5. Permits

    Applications submitted. Timing depends on City review.

  6. Construction and rough-in inspections

    Framing, services, inspections before closing walls.

  7. Final inspection and handover

    Walkthrough, deficiencies, documents, warranty.

Written change order and checklist beside a scope of work

When things change

Hidden conditions happen. Any change gets a written change order with cost and time impact, and nothing proceeds until you approve it.

Plastic dust barrier and protected path through a home during a basement renovation

Living through the build

Agreed work hours, dust control, a protected path through the house and a weekly update so you know what's next.

Paperwork you'll get

Weekly progress report with photos, completed work and next steps

Weekly progress report.

Handover checklist for a basement suite

Handover checklist and keys.

Dates and limitations

  • City review times change. We share current windows, dated.
  • Time estimates come after scope is set, not before.
  • This page is general guidance, not legal or code advice.