New legal basement suites

Build a legal basement suite that fits your Calgary home.

Starting from bare concrete or converting a finished basement, we scope the suite around your house, your budget and how you actually plan to use it.

Not every basement can become a legal suite. If yours can't, we'll tell you early, before you've paid for drawings.

[Project stage + neighbourhood]
Is this for my property?

Two ways in

Unfinished basement

Bare concrete or partly framed. The most design freedom, with plumbing, heating and egress planned from scratch.

  • Layout built around the suite
  • Systems sized for two households
  • Usually the clearest scope

Finished basement conversion

Already developed, often as a rec room or that “gym” with one dumbbell in it. Some finishes can stay, but walls and ceilings may need to open up to meet suite requirements.

  • Reuse what can be reused
  • Hidden conditions are the main risk
  • An assessment is strongly recommended
What's included?

What a typical suite includes

Design coordination and permit drawings with our partners
Framing, insulation, drywall and finishing
Kitchen, bathroom and laundry rough-ins and fit-out
Licensed electrical, plumbing and gas work
Fire separation, smoke alarms and egress windows
Inspections, handover and documentation

Sample

What a scope sheet looks like

Illustrative format only. Not a real client scope.

What might change?

Access, height and systems: the three big checks

Access

A shared entry, an existing side door or a new exterior entrance. A new stairwell is one of the biggest single cost drivers.

Ceiling height

Ducts and beams love to eat headroom. We measure before anyone draws a layout.

Systems

Electrical panel capacity, plumbing routes, and heating and ventilation for a second household.

Budget

Plan for the whole scope, not just the finishes.

New suites typically land between [$ RANGE] + GST, depending on where you start and how people get in.

See What Changes the Cost

Usually not included

  • Appliances and furniture [confirm]
  • Landscaping beyond the entrance
  • Unforeseen structural or environmental remediation
  • City fees, unless the quote says otherwise
Who's responsible?

Construction and inspection stages

  1. Permits approved

    Drawings submitted with our partners. Nothing gets built before approval.

  2. Framing and rough-ins

    Walls, plumbing, electrical and ducting, photographed before anything is closed up.

  3. Rough-in inspections

    City inspections pass before insulation and drywall go in.

  4. Insulation, drywall and finishes

    Sound separation and fire-rated assemblies installed as specified.

  5. Final inspection and handover

    A walkthrough, a deficiency list, your documents and warranty.

See the full permit and construction process

Sound between households

Code minimums and real-life comfort aren't always the same thing. Decide before the ceiling closes, not after your tenant's first spin class.

Required

Assemblies that meet suite separation requirements.

Improved

Added insulation and resilient channel for noticeably quieter floors.

Upgraded

Extra mass and decoupling where footsteps matter most.

New suite questions

Does every basement qualify?

No. Height, egress, access and lot rules can rule a basement out. We check early so you don't pay for drawings you can't use.

Feasibility

Can I keep my existing finished basement?

Sometimes, partly. Expect some walls or ceilings to open up for fire separation, sound and services.

Costs

Do I need a separate entrance?

Not always. It depends on your layout and your current access.

Process

How long does a new suite take?

We give you a time window once the scope and permits are set. Anyone who quotes you a timeline before that is guessing.

Process
What happens after I inquire?

Tell us about your basement.

We'll review the fit, ask about its current condition and outside access, then suggest a fit call or an assessment. We reply within [2 business days].